Recent Posts

June 2007: Framing


Interior framing.

June 2007: Logs Assembly


And up she goes!

May 2007: Logs Sorting and Stacking


Organizing the logs beforehand makes assembly go much quicker.

May 2007: Logs Delivery


They trucked the logs for our home up in May, along with crane and crew.

May 2007: Foundation And Flooring


Foundation is in and the base floor is set. Floor joists with 4×8 OBS.

May 2007: Grading and Foundation


And it begins.