Interior framing. [gallery link="file" ids="230,231,232,233,234"]
Archives: Blog
And up she goes! [gallery link="file" ids="238,239,240,241,242"]
Organizing the logs beforehand makes assembly go much quicker. [gallery link="file" ids="245,246,247,248,249"]
They trucked the logs for our home up in May, along with crane and crew. [gallery link="file" ids="252,253,254"]
Foundation is in and the base floor is set. Floor joists with 4x8 OBS. [gallery link="file" ids="263,264,265,258,260,266,261,262"]
And it begins. [gallery ids="268,270,272,271,273"]